Magadan data center · capacity reservation

ASIC hosting
at 150 MW scale

For existing and new fleets: hardware review, acceptance, connection, monitoring, maintenance and on-site repair.
RUB 5base tariff
98%target uptime
150 MWdesign capacity
Q1 2027planned commissioning

Three entry points

Choose the right ASIC hosting route

Relocate an operating fleet, source new equipment, or reserve capacity for a large delivery.
01Operating fleet

Relocate ASIC miners

We inspect the hardware, plan logistics and acceptance, and connect each delivery batch.

Relocation and connection planRequest terms
02New fleet

Source and host miners

We configure a mixed fleet, model power and economics, and arrange supply, installation and operations.

Hardware and hosting in one offerBuild a fleet in the catalogue
03Large deployment

Reserve capacity

We align fleet size, cooling and delivery schedule with phased data center commissioning.

Capacity reservation termsRequest terms

Two Mining Space sites

Connect now or reserve future capacity

Serpukhov accepts hardware on operating infrastructure. Magadan is designed for large fleets and phased expansion.
Magadan data centerUnder construction

Magadan Region

Magadan data center

For large fleets and phased expansion: capacity reservation before first-stage commissioning.
capacity
150 MW
target uptime
98%
planned launch
Q1 2027

Serpukhov figures relate to the operating site. Magadan parameters are design targets and are confirmed for each capacity reservation.

Service scope

Hosting with operations and repair

  1. 01

    Incoming audit

    Models, firmware, condition, PSUs, total power draw and cooling requirements.

  2. 02

    Acceptance and installation

    Asset labeling, placement, connection, network checks and operating-mode verification.

  3. 03

    24/7 operations

    Availability, hashrate, temperature and power monitoring under the operating procedure.

  4. 04

    Maintenance and repair

    Diagnostics, cleaning, on-site workshop, RMA coordination and return to service.

One operating standard

What ASIC owners receive

Both sites use one management framework—from device monitoring and billing to maintenance and physical security.
01

24/7 monitoring

Track availability, hashrate, temperature and power demand for each miner.

02

Dashboard and billing

Consumption history, charges and alerts in one interface.

03

Technical maintenance

Diagnostics, cleaning, firmware updates and return-to-service procedures.

04

Access control

Closed perimeter, CCTV and controlled access to equipment.

Mining Space data center containers
Mining Space technician at the site
ASIC hardware at a Mining Space site

Commercial benchmarks

Hosting terms

The tariff and SLA are confirmed after reviewing the fleet and connection schedule.
RUB 5

base tariff

per kWh; final terms are confirmed for the agreed fleet and schedule

98%

target uptime

calculation method, exclusions and remedies are documented in the SLA

Phased

fleet connection

capacity stages are tied to agreed ASIC delivery batches

24/7

operations team

monitoring, technicians, security and on-site service

My fleet economics

Calculate your ASIC fleet economics

Market data loads automatically and remains editable. The result is an estimate, not a return promise.

MINING SPACE · MINING PROJECT FINANCIAL MODEL

Economics of your ASIC fleet

Mixed ASIC fleet, live market inputs and cash flow in one model.
Updating market data…8/1/26, 3:00 AM MSK
01

ASIC fleet

100 ASIC · 364.5 kW
02

Tariff and market

All assumptions are editable
03

Scenario

36 months
Forecast horizon

FAQ

Before requesting capacity

01Can I reserve capacity in Magadan now?+

Yes. Provide fleet size, ASIC models, cooling and preferred schedule. Capacity and terms are documented in the commercial offer and agreement.

02Does the RUB 5/kWh rate apply to every fleet?+

RUB 5/kWh is the project base rate. Final terms depend on capacity, hardware, cooling and reservation period.

03Can you host used equipment?+

Yes. Models, condition and firmware are agreed before acceptance. Hardware with defects or prior repairs receives a separate incoming-inspection plan.

04What does 98% target uptime mean?+

It is the project service-availability target. Calculation, planned maintenance, external restrictions and remedies are documented in the contract SLA.

05Can I model economics before submitting a request?+

Yes. The calculator supports mixed fleets and editable tariff, uptime and market inputs. Contact details are needed only to confirm capacity and prepare an offer.

Next step

We will review the fleet and prepare hosting terms

For an initial assessment, provide models, quantities, total power and target connection date.
RUB 5/kWh98% target uptime150 MW design capacity
+7 (985) 035-18-89
A manager will verify the equipment, available capacity, rate, and connection timing and contact you.