Under construction · Magadan Region

Bitcoin miningdata center“Magadan”

A 150 MW end-to-end Bitcoin production facility powered by the isolated hydropower system of the Magadan Region.

Data-center capacity150 MW
01
Firstin Russia
07
Seventhworldwide

Conditions designed for industrial-scale mining

The rate, target availability, climate, customs treatment, and on-site service each affect a different part of fleet economics.

0.06₽per kWh

Base electricity rate

The indicative rate used for capacity planning and project modeling is $0.06/kWh. Final terms are confirmed for the fleet and contract.

98%target uptime

Target uptime

24/7 monitoring, an on-site technical team, and a repair workshop support equipment availability. The SLA defines the calculation method and exclusions.

22%CAPEX saving*

Potential ASIC import CAPEX reduction

Special Economic Zone treatment may reduce customs and VAT costs, subject to participant status, import structure, and legal applicability.

−2.3°Cannual average

Cold annual climate

Lower ambient temperatures reduce cooling load and help limit thermal stress on ASIC hardware.

* The potential saving of up to 22% depends on participant status, shipment structure, and the applicability of the SEZ regime to the transaction.

One facility, four ways to participate

Host equipment, build a mining business, or choose an investment route.

Power supplied through the Magadan regional grid

The Kolyma and Ust-Srednekan hydropower plants operate within the isolated regional power system. The project’s external grid connection runs through the Orotukan 220 kV substation.

Kolyma HPP
Kolyma HPP900 MW · upper stage of the cascade
Ust-Srednekan HPP
Ust-Srednekan HPP570 MW · lower stage of the cascade
Hydropower generationPower transmissionSHA‑256 computingCategory III · based on project data

Magadan data-center infrastructure

The first phase combines 9 mining halls, 36 water-cooling-ready containers, 37 transformer substations, and an on-site repair and operations center.

Functional zones of the Magadan data-center infrastructure

9 halls and 36 containers

Each hall is designed for 12.5 MW of air-cooled load; each 1 MW container can support water-cooled ASIC configurations.

On-site warranty repair and service

Service is provided by technicians trained to work with leading ASIC manufacturers.

37 transformer substations, 35/0.4 kV

On-site power distribution for data-center buildings and computing load.

Administration, accommodation, and canteen

Facilities support 24/7 technical operations and on-site staff accommodation.

Technical profile

Core specifications for the facility, power supply, and operations.

Design capacity
150 MW
Site area
20 ha
Planned commissioning
Q1 2027
Target uptime
98%
01

Scale

150MWDesign capacity
Site area
20 ha
Planned commissioning
Q1 2027
Purpose
industrial Bitcoin mining
02

Power

  1. Generation2 hydropower plants
  2. Grid nodeOrotukan 220/35 kV substation
  3. Distribution35 / 0.4 kV
External supply
independent 220 kV transmission lines
Reliability category
Category III, based on project data
03

Operations

Cooling
air and liquid cooling
Technical team
24/7 with on-site staff accommodation
Repair
on-site warranty repair and service
Security
24/7 armed security
Target uptime98%

The project has moved into active construction

Aerial footage, structural installation, equipment delivery, and works at the Orotukan substation document the current project stage.

Magadan data center construction
Technical connection works at the Orotukan 220/35 kV substation
01

Works at the Orotukan substation

Substation works support the project’s external power supply.

Aerial view of the Magadan data-center construction site
02

Site prepared

Access roads, the construction site, and the work fronts for construction and installation have been prepared.

Steel-frame installation at the Magadan data center
03

Buildings under construction

Steel structures for the data-center production buildings are being installed.

35/0.4 kV transformers at the Magadan data-center site
04

Equipment supply secured

Core technology equipment, construction materials, and installation materials have been delivered to the data-center site.

First-phase delivery

The project has passed key milestones

Planned commissioningQ1 2027

Phase one · 150 MW

  1. 01Confirmed

    Design and construction permit

    Design and construction documentation has been completed; the project received a positive expert review and a construction permit.

  2. 02In progress

    External power supply

    The external power scheme is approved. Grid connection to the Orotukan 220 kV substation is in progress.

  3. 03Signed

    Regional agreement

    A tripartite agreement has been signed with the Magadan Region and the energy partner.

  4. 04SEZ confirmed

    Preferential regimes

    A project company has been established as an SEZ participant. The Priority Development Area status process continues.

  5. 05In progress

    Construction and installation

    Buildings and infrastructure are under construction; core equipment and construction materials have been delivered.

Project documents

After NDA, investors receive access to technical, legal, and financial materials.

Open the investment brief ↗

Lead investor and public-sector support

Coat of arms of the Russian Federation
Lead investor and project sponsor

The group contributes capabilities in construction, telecommunications, IT, and large-asset management.

$36.8 bn
assets
FY 2025
$17.0 bn
annual revenue
FY 2025
RusHydro
Energy partner

A party to the agreement covering project delivery and electricity-rate cooperation.

GovernmentMagadan Region
Regional support

Public-sector coordination for project delivery and regional support measures.

01 · Regional government

Support from the Magadan Region

The Magadan Region, AFK Sistema, and RusHydro signed an agreement covering project delivery and electricity-rate cooperation.

02 · Special Economic Zone

A project company has been established as an SEZ participant

The status provides access to tax preferences. The proprietary-mining model may benefit from lower ASIC CAPEX through VAT treatment, subject to applicable requirements.

03 · Energy infrastructure

Grid connection and direct power purchase are secured by contracts

Contracts have been signed with Magadanenergo and RusHydro. Applicable legislation permits bilateral power-purchase agreements with generators.

04 · Priority Development Area

Priority Development Area status is being processed

After approval, the project may apply the tax benefits provided under the regime.

05 · Priority Development Area tax benefits

The preferential regime reduces the tax burden during construction and operations

  • 0% profit tax for the first 5 years; 18% for the following 5 years
  • social insurance contributions at 7.6% for 10 years
  • 0% property tax for 5 years

The lead investor’s capital, the agreement with RusHydro, and regional support measures reduce the project’s infrastructure and tax risks.

Project questions

When can equipment be connected?+

Planned commissioning is Q1 2027. The connection schedule for each shipment is confirmed when capacity is reserved.

What is included in the base electricity rate?+

The hosting scope, service package, and SLA are confirmed for the fleet size, ASIC model, and cooling method.

Can Mining Space source and commission ASICs?+

Yes. The turnkey scope combines ASIC selection and supply, installation, connection, monitoring, maintenance, and repair.

How can an investor receive project materials?+

A manager first confirms the investment route. Controlled technical, legal, and financial materials are provided to qualified partners after NDA.

Contact Mining Space

Start with your project

Share the required capacity, fleet composition, or investment route. A project manager will confirm the applicable terms.

+7 (985) 035-18-89
A manager will verify the equipment, available capacity, rate, and connection timing and contact you.