Base electricity rate
The indicative rate used for capacity planning and project modeling is $0.06/kWh. Final terms are confirmed for the fleet and contract.
Under construction · Magadan Region
A 150 MW end-to-end Bitcoin production facility powered by the isolated hydropower system of the Magadan Region.
The rate, target availability, climate, customs treatment, and on-site service each affect a different part of fleet economics.
The indicative rate used for capacity planning and project modeling is $0.06/kWh. Final terms are confirmed for the fleet and contract.
24/7 monitoring, an on-site technical team, and a repair workshop support equipment availability. The SLA defines the calculation method and exclusions.
Special Economic Zone treatment may reduce customs and VAT costs, subject to participant status, import structure, and legal applicability.
Lower ambient temperatures reduce cooling load and help limit thermal stress on ASIC hardware.
* The potential saving of up to 22% depends on participant status, shipment structure, and the applicability of the SEZ regime to the transaction.
Host equipment, build a mining business, or choose an investment route.
Reserve power, connect an existing fleet, and transfer day-to-day operations to the on-site team.
ASIC sourcing, delivery, installation, commissioning, monitoring, maintenance, and repair in one delivery scope.
Invest through a fund unit without purchasing or operating an individual ASIC fleet.
Discuss an equity interest in the 150 MW infrastructure project after investor qualification and NDA.
Discuss an equity interest in the 150 MW infrastructure project after investor qualification and NDA.
Reserve power, connect an existing fleet, and transfer day-to-day operations to the on-site team.
ASIC sourcing, delivery, installation, commissioning, monitoring, maintenance, and repair in one delivery scope.
Invest through a fund unit without purchasing or operating an individual ASIC fleet.
The Kolyma and Ust-Srednekan hydropower plants operate within the isolated regional power system. The project’s external grid connection runs through the Orotukan 220 kV substation.


Upper stage of the cascade
Lower stage of the cascade
220 kV intake
150 MW of computing infrastructure
Digital asset recorded
The first phase combines 9 mining halls, 36 water-cooling-ready containers, 37 transformer substations, and an on-site repair and operations center.

Each hall is designed for 12.5 MW of air-cooled load; each 1 MW container can support water-cooled ASIC configurations.
Service is provided by technicians trained to work with leading ASIC manufacturers.
On-site power distribution for data-center buildings and computing load.
Facilities support 24/7 technical operations and on-site staff accommodation.
Core specifications for the facility, power supply, and operations.
Aerial footage, structural installation, equipment delivery, and works at the Orotukan substation document the current project stage.

Substation works support the project’s external power supply.

Access roads, the construction site, and the work fronts for construction and installation have been prepared.

Steel structures for the data-center production buildings are being installed.

Core technology equipment, construction materials, and installation materials have been delivered to the data-center site.
Phase one · 150 MW
Design and construction documentation has been completed; the project received a positive expert review and a construction permit.
The external power scheme is approved. Grid connection to the Orotukan 220 kV substation is in progress.
A tripartite agreement has been signed with the Magadan Region and the energy partner.
A project company has been established as an SEZ participant. The Priority Development Area status process continues.
Buildings and infrastructure are under construction; core equipment and construction materials have been delivered.
After NDA, investors receive access to technical, legal, and financial materials.
The group contributes capabilities in construction, telecommunications, IT, and large-asset management.
A party to the agreement covering project delivery and electricity-rate cooperation.
Public-sector coordination for project delivery and regional support measures.
The Magadan Region, AFK Sistema, and RusHydro signed an agreement covering project delivery and electricity-rate cooperation.
The status provides access to tax preferences. The proprietary-mining model may benefit from lower ASIC CAPEX through VAT treatment, subject to applicable requirements.
Contracts have been signed with Magadanenergo and RusHydro. Applicable legislation permits bilateral power-purchase agreements with generators.
After approval, the project may apply the tax benefits provided under the regime.
The lead investor’s capital, the agreement with RusHydro, and regional support measures reduce the project’s infrastructure and tax risks.
Planned commissioning is Q1 2027. The connection schedule for each shipment is confirmed when capacity is reserved.
The hosting scope, service package, and SLA are confirmed for the fleet size, ASIC model, and cooling method.
Yes. The turnkey scope combines ASIC selection and supply, installation, connection, monitoring, maintenance, and repair.
A manager first confirms the investment route. Controlled technical, legal, and financial materials are provided to qualified partners after NDA.
Contact Mining Space
Share the required capacity, fleet composition, or investment route. A project manager will confirm the applicable terms.
+7 (985) 035-18-89Tell us what you need: ASIC hosting, a turnkey mining project, or an investment partnership.