Investment brief · Magadan Region
The project is under construction with planned first-phase commissioning in Q1 2027. AFK Sistema is the lead investor and project sponsor.
From a Bitcoin transaction to the miner’s reward in a digital asset.
Mining secures the Bitcoin network and converts computing work into a digital asset.
Bitcoin follows one protocol worldwide and is not the currency of any single country.
Users submit transactions to the network.
ASIC miners compete to find the next block.
The network accepts the valid computation result.
The miner receives BTC and transaction fees.
Users submit transactions to the network.
ASIC miners compete to find the next block.
The network accepts the valid computation result.
The miner receives BTC and transaction fees.
An investor can earn infrastructure revenue or participate directly in BTC mining.
The Magadan project supports three models: colocation, proprietary mining, and a hybrid format.
Industrial mining has created a global market for capital-intensive digital infrastructure.
The 15 largest countries account for 90.4% of global hashrate. Competition centers on access to power, industrial sites, and professional operations.
Russia ranks second globally and is rapidly expanding its industrial mining infrastructure.
Commercial segment: 13 major operators above 1 MW. Installed and announced capacity totals about 3,352 MW.
Russian mining capacity is growing faster than revenue, reflecting active site construction, stronger competition, and operator consolidation.
Efficient ASICs, industrial data centers, and institutional B2B capital are accelerating industry growth.
New chip generations improve hardware energy efficiency
computing capacity concentrated at industrial sites
financing for hardware, power, and operations
Straight-line distances are indicative. Actual transport distance depends on the port, carrier, and delivery route.
Magadan combines low-cost power, a predominantly cold climate, and access to 150 MW.
The regional system is not connected to Russia’s unified grid and has no external power flows.
Estimated available reserve exceeds 300 MW.
The Kolyma and Ust-Srednekan HPPs provide about 94% of regional generation.
Core specifications for the facility, power supply, and operations.
The first phase combines 9 mining halls, 36 water-cooling-ready containers, 37 transformer substations, and an on-site repair and operations center.

Each hall is designed for 12.5 MW of air-cooled load; each 1 MW container can support water-cooled ASIC configurations.
Service is provided by technicians trained to work with leading ASIC manufacturers.
On-site power distribution for data-center buildings and computing load.
Facilities support 24/7 technical operations and on-site staff accommodation.
The group contributes capabilities in construction, telecommunications, IT, and large-asset management.
A party to the agreement covering project delivery and electricity-rate cooperation.
Public-sector coordination for project delivery and regional support measures.
The Magadan Region, AFK Sistema, and RusHydro signed an agreement covering project delivery and electricity-rate cooperation.
The status provides access to tax preferences. The proprietary-mining model may benefit from lower ASIC CAPEX through VAT treatment, subject to applicable requirements.
Contracts have been signed with Magadanenergo and RusHydro. Applicable legislation permits bilateral power-purchase agreements with generators.
After approval, the project may apply the tax benefits provided under the regime.
The lead investor’s capital, the agreement with RusHydro, and regional support measures reduce the project’s infrastructure and tax risks.
The project combines ASIC supply with access to established mining pools.
ASIC hardware manufacturing for industrial mining.
ASIC hardware manufacturing for industrial mining.
ASIC hardware manufacturing for industrial mining.
Preferred mining-pool participation terms.
One of the world’s largest mining pools.
A major international mining pool.
The project is built around Chinese hardware manufacturers and established mining pools.
Current market conditions create an entry window for industrial mining
$126 000 → $60 000
$8 500 → $4 000
Two-year low
The project is in active construction, including grid connection, building structures, and foundation works.




After NDA, the investment manager arranges an in-person review of the documents, financial model, site visit, and participation terms.
Financial model · power agreements · grid connection · permits · construction budget and schedule · corporate and tax model · participation terms · risk register.
Personal investment review
Менеджер уточнит предполагаемую долю, роль инвестора и требования к проверке. После NDA команда проекта очно представит документы, расчёты и условия участия.
This page is not an offer or individualized investment advice. Returns, valuation, participation size, and exit terms are defined by the documents of the specific transaction.
Tell us what you need: ASIC hosting, a turnkey mining project, or an investment partnership.